Monroe Bypass Backfilling and Roof Slab Prep to Connect to Existing Culvert

Monroe 03.29.17 pic 3

Progress backfilling around approx.. 700′ double box culvert at E. Independence Blvd.

Monroe 03.29.17 pic 4

Backfilling with crushed stone at C200.

Monroe 03.29.17 pic 5

Monroe 03.29.17 pic 2

Culvert at Median in E. Independence Blvd. roof slab connection to existing culvert