Hanover Co. Replacement of Old Triple Barrel Culvert

375 03.31.17 pic 1

View of existing triple barrel culvert after rain event.

375 03.31.17 pic 2

Welding of two 36″ pipe, over 500′ in length to be place to divert water while demo/construction takes place.

375 03.31.17 pic 3 375 03.31.17 pic 4

375 03.18.17 pic 1

Previous excavation work done by sub to relocate sewer, water, and utility lines in preparation for triple barrel culvert replacement.