Confined Space Backfill at Culvert in Asheboro, NC

C 100 Pic 2

Backfilling work finished: barrel filled with 2′ native material using skid steer and implementing Confined Space safety procedures

C100 Pic 3

Adjacent culvert (double box reinforced) complicated due to fabricated barrel concrete configuration

MCC 360 C100

Photo First Stage Backfilling